It is necessary to imagine the sum of the areas between each z-score and the average.
Given as the ratio of the area under the normal curve between two z-scores, both above average.
The Z score accurately measures the number of standard deviations above or below the mean of the data points.
The formula for calculating the z-score is
z = (data points – mean) / (standard deviation).
It is also expressed as z = (x-μ) / σ.
- A positive z-score indicates that the data points are above average.
- A negative z-score indicates that the data points are below average.
- A z-score close to 0 means that the data points are close to average.
- The normal curve is symmetric with respect to the mean and needs to be investigated.
Therefore, to find the percentage of the area under the normal curve between two z-scores, both above the mean, you need to look at the sum of the areas between the z-score and the mean.
Learn more about z-score from here brainly.com/question/16768891
#SPJ4
Answer: Total molding cost is $197.20.
Step-by-step explanation:
Since we have given that
Length of oil painting frame = 22 inch
Width of oil painting frame = 30 inch
Width for molding = 4 inches
So, Length after molding would be
4+22+4 = 30 inches
Width after molding would be
4+30+4 = 38 inches
So, Perimeter of molding would be

Cost per inch = $1.45
So, Total molding cost would be

Hence, Total molding cost is $197.20.
The sixth graders collected $250 of their $300 goal. The seventh graders collected $250 of thier $450 goal.
Sixth Graders:
$250 / $300
Reduce: $25 / $30 = 5/6
Seventh Graders:
$250 / $450
Reduce: $25 / $45 = 5/9
When expanding number, we should separate the numbers according to the places like the number 275 written in expanded form 200+70+5. So, in this question we must likely done like this. The number is 39,005 the sum that is written on expanded form is 30,000+9,000+5.
You need 2-7 all answered ?