Answer:
318 days or 10.6 months,
No, because the time between august and december is 8 months and it would take 10 to complete the tunnel
Step-by-step explanation:
start by determining the slope:
subtract the remaining distance from the total distance to determine distance so far, then divide by time.
m = (3200 - 1700)/5
m = 1500/5
m = 300
y = mx + b
Plug in to solve for x.
3200 = 300x + 0
3200 = 300x
divide y by m. This is x. (this is known as inverse operation if you didnt know already.)
3200 = 300(10.6_)
Answer:
If Andrew works for 30 for $4 he will have a total wage of 30×4=$120
And gets additional $5for every hr worked beyond 30hrs in that week
So he gets a total of 5(x-30)
So if he works for 40hrs he gets a total wage of
5(40-30)=50
120+50=$170
If he works for 50 hours he gets Total wage of
5(50-30)=100
120+100=$220
Subtracting 3x^4+9x^3+3x^2 from the divided and bringing down 13x.
Answer:
Step-by-step explanation:
Let's say the width is x. If the length is 3 meters more than the width, the the length is x+3.
A rectangle has 4 sides. 2 widths and 2 lengths. If the perimeter is 26 meters, you can plug in your expressions for the width and the length to solve for x.
2(x+3) +2(x)=26
2x+6+2x=26
4x+6=26
4x=20
x=5.
If x=5, that means that your with is 5 meters, and your length is 8 meters (5+3)