Answer:
for question a Tom is working at a faster pace because he is currently installing 7 windows a day while Suzanne is only installing 6 windows per day.
for question b Suzanne started off with more windows installed. I know this because the equation says that tom started with 3 windows installed and suzanne started with 5 windows installed.
Step-by-step explanation:
Answer:

Step-by-step explanation:
Given the function: 
f(x) =number of days it would take to complete the project
x =number of full-time workers.

The domain of a function is the complete set of possible values of the independent variable.
In this case, the independent variable is x, the number of full-time workers. We have shown that x cannot be zero as there must be at least a worker on ground.
Therefore, an appropriate domain of the function f(x) is the set of positive integers (from 1 to infinity).

Answer:
<h2>NO</h2>
Step-by-step explanation:
A function only gives ONE output but that right there gives two!
Answer:
7.96 ft
Step-by-step explanation:
Given;
Length of ramp L = 8 ft
Angle with the horizontal (ground) = 6°
Applying trigonometry;
With the length of ramp as the hypothenuse,
The horizontal distance d as the adjacent to angle 6°
Since we want to calculate the adjacent and we have the hypothenuse and the angle. We can apply cosine;
Cosθ = adjacent/hypothenuse
Substituting the values;
Cos6° = d/8
d = 8cos6°
d = 7.956175162946
d = 7.96 ft
The building is 7.96ft away from the entry point of the ramp.
Answer:
$2833.33
Step-by-step explanation:
1. You take 85 and divide it by 3%