7.3 km/y
at least if i did this correctly but that's always a stretch.
because it takes 50 days to complete a km
so 365/50 = 7.3
The correct name for the line shown is the answer choice C.
It can be A because the picture is a line not a ray and it cant be B because the picture shown is not a segment
Hope this helps :)