Answer:
Hence the 3.28 %or 2/61 of total work will be done .
Step-by-step explanation:
Given:
The pecan crops are harvested for friday and saturday (2days)
To find :
What fraction these 2 days corresponds to the harvesting days?
Solution;
The pecan crops are growing in America in state of Georgia
and consider that in months of October and November pecan crop becomes mature .
Hence the harvesting period is of 2 months considerably .
The month of October and November days are 31 and 30 .
Hence the Total days of harvesting are 61 days.
In these days total Pecan crops will be harvested.(100% work in 61 days)
Now the farmer harvest for 2 days only .
Required fraction=2/61
=0.0327869
=3.28%
Depending upon the crop field and planting answer will vary
But 3.28 % of total work will be done in 2 days on harvesting
Answer:1
Step-by-step explanation: Rearrange the equation by subtracting what is to the right of the greater than sign from both sides of the inequality :
-2*x+5-(7)<0
Step by step solution :
STEP
1
:
Pulling out like terms
1.1 Pull out like factors :
-2x - 2 = -2 • (x + 1)
Equation at the end of step
1
:
STEP
2
:
2.1 Divide both sides by -2
Remember to flip the inequality sign:
Solve Basic Inequality :
2.2 Subtract 1 from both sides
x > -1
Inequality Plot :
2.3 Inequality plot for
-2.000 X - 2.000 > 0
One solution was found :
x > -1
Answer:
4π(w+1)(w-1)
Step-by-step explanation:
The total surface area of the cylinder
= 2 x area of base circle + area of vertical surface
= 2x pi x radius^2 + 2x pi x radius x height
= 2π(w-1)^2 + 2π(w-1)(w+3)
= 2π[w^2-2w+1 + w^2+2w-3]
= 2π(2w^2-2)
= 4π(w^2 - 1)
= 4π(w+1)(w-1)
Answer: The answer is around 16.66%
Answer:
4b^2+2b (b^2 means b squared)
Step-by-step explanation: