A)
Let's pick point (4,4) and point (2,2). If you divide the new point by the old point you will see that both the x-value and the y-value were multiplied by 2 to gt the new x-value and new y- value. So the scale factor is 2.
The perimeter of the first square can be found by subtracting the x-values from two points to get the length of one side and then multiply the result by 4 to get the perimeter of the whole square.
2-(-2)=4
The length of one side of the first square is 4. (I just subtracted the x-values.)
4 times 4 = 16.
The perimeter of the first square is 16.
Similarly, 4-(-4)=8 and 8 times 4 = 32.
The perimeter of the second square is 32.
b)
Let's pick point (6,6) and point (3,3). If you divide the new point by the old point you will see that both the x-value and the y-value were multiplied by 2 to gt the new x-value and new y- value. So the scale factor is 2.
The perimeter of the first square can be found by subtracting the x-values from two points to get the length of one side and then multiply the result by 4 to get the perimeter of the whole square.
3-(-3)=6
6 times 4 = 24.
The perimeter of the first square is 24.
Similarly, 6-(-6)=12 and 12 times 4 =48.
The perimeter of the second square is 48.
c)
If a figure is dilated to a scale factor of 2 then the perimeter of the figure will also be doubled.
Answer:

Step-by-step explanation:
The required answer is the rate at which Machine A works when the two machines are combined.
Note: the rate of doing work is express as

Hence we can conclude that Machine A working rate is
and machine B working rate is

When the two machine works together, the effective working rate is

The fraction of the work that Machine B will not have complete because of Machine A help is the total work done by machine A
Hence the fraction of work done by A is expressed as


Hence the fraction of the work that Machine B will not have complete because of Machine A help is the total work done by machine A is 
Cost=$200
sales tax rate, r= 8%
tax=cost*r=$200*0.08=$16
total cost = cost+tax=$200+$16=$216
Answer:
25,200 ft/ 1 hour
Step-by-step explanation: