Answer: $0.28
Step-by-step explanation: Pic is attached. Hope this helps. Sorry for the bad handwriting, I'm writing with a mouse.
Answer:
the number of short sleeves sold is 42
Step-by-step explanation:
The computation of the number of short sleeves sold is shown below:
Given that
The clothing store sold 98 long sleeve shirts
And, the ratio of short sleeve to long sleeve is 3:7
So, the number of short sleeves sold is
= 98 × 3 ÷ 7
= 42
Hence, the number of short sleeves sold is 42
Answer:
58 minutes.
Step-by-step explanation:
From the question, Karen worked on the model in two windows;
1) 11.13 AM - 11.54 AM = 41 minutes
2) 1.29 PM - 1.46 PM = 17 minutes.
Hence, the total amount of time Karen spent working on the Shuttle model is:
41minutes + 17minutes = 58 minutes.
lol it's so hard I can't proses
Answer:
The time taken for the projectile to reach the given height is 1.2 s.
Step-by-step explanation:
Given;
height of travel, h = 25 ft
initial velocity of the projectile, u = 15 ft/s
The time taken for the projectile to travel a height of 25 ft is given by the following kinematic equation;
h = ut + ¹/₂gt²
25 = 15t + ¹/₂(9.8)t²
25 = 15t + 4.9t²
4.9t² + 15t - 25 = 0
solving the quadratic equation, we will have the following solution of t;
t = 1.2 s
Therefore, the time taken for the projectile to reach the given height is 1.2 s.