1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Lilit [14]
2 years ago
11

WILL GIVE BRAINLIEST IF IT IS CORRECT.

Mathematics
1 answer:
Luba_88 [7]2 years ago
6 0
I don’t know the answer too hope you find some that can help
You might be interested in
I need help with problems 20,22,24,26 and 28
Nostrana [21]
Convert milliliters to feet and then multiply 1 1/4 by 3 do the same but convert to the problems it says
5 0
3 years ago
So sorry to ask another question but I need some help-
Vika [28.1K]

Answer:

14x + 23

Step-by-step explanation:

The lengths of three sides of a triangle are 5x + 9 feet, 2x + 14 feet, and 7x feet.

The perimeter of a triangle: the sum of all of its sides.

5x + 9 + 2x + 14 + 7x

14x + 23

It's the expression of the perimeter of the triangle. Once you will be asked to find x, you'll probably be given the exact perimeter of the triangle.

7 0
2 years ago
Which term has the definition "The mean, median, or mode of a dataset. Also known
Mice21 [21]
The mean is usually the best measure of central tendency to use when your data distribution is continuous and symmetrical, such as when your data is normally distributed. However, it all depends on what you are trying to show from your data.
3 0
2 years ago
Identify the leading coefficient in the following polynomial:<br> – 5x² + 3x - 7
insens350 [35]

Answer:

-5

Step-by-step explanation:

The leading coefficient means the thing you're multiplying your highest power by. Here, your highest power of x is x^2, and that term's coeff. is -5, so the leading coefficient is -5.

7 0
3 years ago
A small business makes 3-speed and 10-speed bicycles at two different factories. Factory A produces 16 3-speed and 20 10-speed b
GarryVolchara [31]

Answer:

Factory A should be operated 6.11 days

Factory B should be operated 6.88 days

The minimum cost for factory A is $6,110

The minimum cost for factory B is $5,504

Step-by-step explanation:

Factory A

Daily production: 16 3-speed and 20 10-speed bikes

Total daily production = 16+20 = 36 speed bikes

Order: 80 3-speed and 140 10-speed bikes

Total order = 80+140 = 220 speed bikes

Number of days = 220/36 = 6.11 days

Cost per day = $1,000

Minimum cost for 6.11 days = $1000 × 6.11 = $6,110

Factory B

Daily production: 12 3-speed and 20 10-speed bikes

Total daily production = 12+20 = 32 speed bikes

Total order = 220 speed bikes

Number of days = 220/36 = 6.88 days

Cost per day = $800

Cost for 6.88 days = $800 × 6.88 = $5,504

6 0
3 years ago
Other questions:
  • 49, 34, and 48 students are selected from the Sophomore, Junior, and Senior classes with 496, 348, and 481 students respectively
    11·1 answer
  • A sandwich store charges a delivery fee to bring lunch to an office building. One office pays $33 for 4 turkey sandwiches. Anoth
    13·1 answer
  • Find cos(sin-1(3/5))
    10·1 answer
  • The aspect of consistency means that ____. a. the association should be compatible with existing theory and knowledge b. the ass
    10·1 answer
  • Solve the linear equation - 7(x + 2) = -3(x - 5) for x
    9·1 answer
  • I GIVE BRAINLIEST MARKS I SWEAR rational functions, construct table values and sketch the graph of rational functions
    13·2 answers
  • Please help me I need this answer
    5·1 answer
  • casey has 42 necklaces and 70 pairs of earrings to put into sets to sell. The greatest common factor for the number of necklaces
    14·2 answers
  • Write a real-life word problem that corresponds to the equation below.
    6·1 answer
  • Please help I can't figure out the mode
    10·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!