Well, for a line with a slope of 3/4, any other parallel line to it, will also have the same slope of 3/4
so if the line through (2, -1) is parallel to it, it has a slope of 3/4 as well
I am not sure, but this is what I got:
<span>Pipe ALONE = 18 hours
Pipe ALONE in 1 hour = 1/18 of the pool
Hose ALONE in 1 hour = 1/25 of the pool
TOGETHER in 1 HOUR = 1/18 +1/25 = 43/450
TOGETHER they will fill the pool in 450/43 hours
So 5/6 of the pool will take 5/6 X 450/43 = 2250/ 258 = 8.7209302 hours OR
8 hours AND 43.26 minutes ANSWER
</span>
Hope this helps!
D the best answer My teacher help me into the equation
Answer:
12 CM is the best answer.
please thanks and follow me