Answer:
Step-by-step explanation:
Researchers measured the data speeds for a particular smartphone carrier at 50 airports.
The highest speed measured was 76.6 Mbps.
n= 50
X[bar]= 17.95
S= 23.39
a. What is the difference between the carrier's highest data speed and the mean of all 50 data speeds?
If the highest speed is 76.6 and the sample mean is 17.95, the difference is 76.6-17.95= 58.65 Mbps
b. How many standard deviations is that [the difference found in part (a)]?
To know how many standard deviations is the max value apart from the sample mean, you have to divide the difference between those two values by the standard deviation
Dif/S= 58.65/23.39= 2.507 ≅ 2.51 Standard deviations
c. Convert the carrier's highest data speed to a z score.
The value is X= 76.6
Using the formula Z= (X - μ)/ δ= (76.6 - 17.95)/ 23.39= 2.51
d. If we consider data speeds that convert to z scores between minus−2 and 2 to be neither significantly low nor significantly high, is the carrier's highest data speed significant?
The Z value corresponding to the highest data speed is 2.51, considerin that is greater than 2 you can assume that it is significant.
I hope it helps!
Answer:
The probability is 0.971032
Step-by-step explanation:
The variable that says the number of components that fail during the useful life of the product follows a binomial distribution.
The Binomial distribution apply when we have n identical and independent events with a probability p of success and a probability 1-p of not success. Then, the probability that x of the n events are success is given by:

In this case, we have 2000 electronics components with a probability 0.005 of fail during the useful life of the product and a probability 0.995 that each component operates without failure during the useful life of the product. Then, the probability that x components of the 2000 fail is:
(eq. 1)
So, the probability that 5 or more of the original 2000 components fail during the useful life of the product is:
P(x ≥ 5) = P(5) + P(6) + ... + P(1999) + P(2000)
We can also calculated that as:
P(x ≥ 5) = 1 - P(x ≤ 4)
Where P(x ≤ 4) = P(0) + P(1) + P(2) + P(3) + P(4)
Then, if we calculate every probability using eq. 1, we get:
P(x ≤ 4) = 0.000044 + 0.000445 + 0.002235 + 0.007479 + 0.018765
P(x ≤ 4) = 0.028968
Finally, P(x ≥ 5) is:
P(x ≥ 5) = 1 - 0.028968
P(x ≥ 5) = 0.971032
The students rented 4 small cars and 8 large cars.
Step-by-step explanation:
Given,
Number of people in small car = 4
Number of people in large car = 7
Total people in both type of cars = 72
Let,
x represent the number of small cars rented.
y represent the number of large cars rented.
According to given statement;
4x+7y=72 Eqn 1
y = 2x Eqn 2
Putting value of y from Eqn 2 in Eqn 1

Dividing both sides by 18

Putting x=4 in Eqn 2

The students rented 4 small cars and 8 large cars.
Keywords: linear equation, substitution method
Learn more about linear equations at:
#LearnwithBrainly
Answer:
35°
Step-by-step explanation:
The sum of the 3 angles in a triangle = 180°
subtract the sum of the 2 given angles from 180° for missing angle
missing angle = 180° - (90 + 55)° = 180° - 145° = 35°