Answer:
<em>losing a baby from something that happened during pregnancy </em>
Explanation:
<h2 />
Answer:
When reviewing your project requirements, it is important to bring your entire team together and review the project part by part along with all the individuals who will participate in it.
Explanation:
Requirements review is a very important step in starting a project. This is because it allows the project to be placed in a document and can be analyzed in a decomposed way. That is, the project leader will be able to analyze each part of the project and make specific notes, modifications and anything else that can reduce flaws and increase the project's capacity to obtain positive results. However, it is important that after this analysis, the leader brings all the project members together and shows them everything that was decided by reviewing the requirements.
<span>c. single-unit packaging.
Single-unit packaging is when the only quantity of medication that's given to the patient is that that's enough for that intake. In an institutional setting, medication is given at the right time, at meals, or off meals, whenever it is prescribed - the patient does not need to worry with when to take or how many he/she still have. The dose given is to be taken right then and is prepared for only one dose intake.</span>
Clarify the goal is your answer.