1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
gavmur [86]
3 years ago
12

There are 31 flavors of ice cream, 2 choices of cones, 1 scoop, 2 scoops, or 3 scoops. How many different choices are there?

Mathematics
1 answer:
Kitty [74]3 years ago
7 0

Answer:

There are 39 different choices

Step-by-step explanation:

Add the the flavors of ice cream the cones and the scoops.

31+2=33

1+2+3=6

33+6=39

Hope this helps

You might be interested in
11 5/8 +9 1/2 is my problem
Leto [7]

Answer:21 1/8 is the answer

Step-by-step explanation:

6 0
2 years ago
HELP ME PLEASE THIS MEANS A LOT TO ME
nevsk [136]

Answer:

I cannot see the screen. Write it out please and I will answer.

Step-by-step explanation:

7 0
3 years ago
3.5 inches divided by 24.5 inches
aliina [53]
Your Answer Is approximately 0.143
6 0
3 years ago
Read 2 more answers
The slope-intercept form of the equation of a line that passes through point (–3, 8) is y = –x + 6. What is the point-slope form
Kisachek [45]

Answer:

-1

Step-by-step explanation:

y = -x + 6 the number in front of x is the point slope

so, the answer is -1 because the number in front of x is -1

6 0
2 years ago
A customer desires to mix her own concrete. The clerk knows that the ratio of cement to sand to gravel is 1:3:4. If the customer
Aleks [24]

Answer:

The quantity of cement use is 125 pounds

The quantity of sand use is 375 pounds

The quantity of gravel use is 500 pounds

Step-by-step explanation:

Given as :

The ratio of cement to sand to gravel = 1 : 3 : 4

The total quantity of dry mix required = 1000 pounds

Let The quantity of cement required = 1 × x pounds

The quantity of sand required = 3 × x pounds

The quantity of gravel required = 4 × x pounds

So, According to question

The total quantity of dry mix required = The quantity of cement required + The quantity of sand required + The quantity of gravel required

Or, x + 3 x + 4 x = 1000 pounds

Or, 8 x = 1000 pounds

∴  x = \frac{1000}{8}

I.e x = 125

So , The quantity of cement required = 1 × 125 pounds = 125 pounds

The quantity of sand required = 3 × 125 pounds = 375 pounds

The quantity of gravel required = 4 × 125 pounds = 500 pounds

Hence The quantity of cement use is 125 pounds

The quantity of sand use is 375 pounds

The quantity of gravel use is 500 pounds

Answer

8 0
3 years ago
Other questions:
  • What is 17,384,069 rounded to the nearest ten
    9·2 answers
  • A square patio has an area of 221 square feet. How long is each side of the patio to the nearest 0.05?
    5·2 answers
  • Can someone do this for me
    9·1 answer
  • 4/7+n/14=-3/7 PLZ HELP
    12·1 answer
  • Which is the graph of f 52
    11·1 answer
  • small juice bottles come in packages of 6. yogurt treats come in packages of 10. paula qanta to have the exact same number of ea
    5·2 answers
  • Which is not in the form of a ratio​
    13·1 answer
  • Diego plays center forward on his soccer team. On average, he scores 1.25 goals per match. The tally of his total goals for the
    5·1 answer
  • 11 3/4 times 5 3/4 times 8
    10·2 answers
  • 6.
    5·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!