Answer: 120 days
Step-by-step explanation:
A can complete it in 16 days.
=100/16 =6.25%/day.
B has ten days to do it.
10% every day is equal to 100/10.
So they would each contribute 16.25 percent per day as a group.
then for six days,
16.25*6 =97.50percent
97.50% of the work has been finished, in other words.
The amount of work left is now 100-97.5 = 2.5.
C finishes up the remaining job in 3 days
3.5% in 3 days, to be exact.
Consequently, he will finish his entire project in 120 days.
[2.5 * 40 = 100 percent; 40 * 3 = 120 days]
I think in the first sentence, that should have been 3/4 instead of 34. Total amount of steak bought (lb)
total amount = (3/4 lb/steak)(12 steak) = 9 lb
To find the total amount that Silvia spends for each pound of steak, we divide $90 by 9 and that will give us an answer of $10.
Female students that participate: 51
male students that don’t: 30
You have to find the square root of 169, then add the square root of 169 by 7
Hope this helped :)
The y intercept is 3
You can also say that the y intercept is at (0,3) which is a more detailed answer. However saying "y intercept is 3" is sufficient enough because the x coordinate of the y intercept is always x = 0.
The y intercept is the location where the graph crosses or touches the y axis. This is at the halfway point between the 2 and 4, so (2+4)/2 = 6/2 = 3