1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
GaryK [48]
2 years ago
8

Can yalllll plllllssss hellppp meeee

Mathematics
1 answer:
PSYCHO15rus [73]2 years ago
8 0
Ummm .... the answer is D
You might be interested in
Please help me out when u can ty
Ket [755]

Answer:

Ian's pattern: 15, 31, 63, and 127.

Nicole's pattern:  485, 1457, and 4373.

Have a nice rest of your day :)

6 0
2 years ago
Read 2 more answers
If f(x) = -5, find the value of x in the function f(x) = 6x + 1.
Debora [2.8K]

Answer:

X = -1

Step-by-step explanation:

f(-1) = 6(-1) + 1

6 * -1 = -6

-6 + 1 is equal to -5

I hope this helps (:

5 0
3 years ago
Jayden drew a scale drawing of an arcade. He used the scale 1 inch = 3 feet. If an air hockey table is 3 inches long in the draw
Romashka-Z-Leto [24]

Answer:

9 Feet

Step-by-step explanation:

Lets start with a ratio:

1:3

Now lets look at the other ratio:

3:?

If the 1 turned into a three in the second ratio, then what will the 3 in the first ratio turn into?

9!

Because 1x=3 should be equivalent to 3x=9

Lets check our work:

x=3

3x=9

Simplify by dividing by 3 on both sides:

x=3

x=3

It worked!

6 0
3 years ago
Read 2 more answers
Please help no explanation
MissTica

Answer:

Help with whaaaaaaaat?

Step-by-step explanation:

5 0
3 years ago
Read 2 more answers
Crane Company recently billed a customer $ 720. Labor hours were 6 and the cost of the materials used was $ 150. If the company’
sertanlavr [38]

The materials were charged at a loading charge of 80.00% of their cost.

The total charge was $720 and included both the material charge and the labor charge.

The first thing to do is therefore find out the cost of the materials without the labor charge:

<em>= Total cost - labor charge</em>

= 720 - (6 labor hours x 75 per labor hour)

= 720 - 450

= $270

The total cost of materials is $270. To find the material loading charge, use the formula:

<em>= (Total cost of materials - Cost of materials used) / Cost of materials used x 100%</em>

= (270 - 150) / 150 x 100%

= 120 / 150 x 100%

= 80%

In conclusion, the material loading charge was 80.00%.

<em>Find out more at brainly.com/question/23089262.</em>

6 0
3 years ago
Other questions:
  • Calculate the distance between the points A=(2,-3) and B=(7,4) in the
    14·1 answer
  • La C = (F - 32).<br> F =
    10·1 answer
  • Heather has to solve this system of equations using elimination. What should be her first step?
    5·2 answers
  • Solve for x<br><br> 3x - 4 = 2x - 10<br><br> x = 14<br> x = 6<br> x = -6<br> x = -14
    9·2 answers
  • Can I get some help on 6&amp;8 please
    13·1 answer
  • Need help ASAP!!!!!!!
    8·1 answer
  • What is the slope of the line which passes through (4, 7) and (2, 3)? (5 points)
    14·1 answer
  • A man, 1.5m tall, is on top of a building. He observes a car on the road at an angle of 75°. If the building is 30m, how far is
    5·1 answer
  • Need help pls I’m begging u
    9·2 answers
  • Reuben learned in art class that a mosaic is made by arranging small pieces of colored material such as glass or tile to create
    11·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!