Answer:
Please clarify the question so I can answer :)
Step-by-step explanation:
Answer: 120 days
Step-by-step explanation:
A can complete it in 16 days.
=100/16 =6.25%/day.
B has ten days to do it.
10% every day is equal to 100/10.
So they would each contribute 16.25 percent per day as a group.
then for six days,
16.25*6 =97.50percent
97.50% of the work has been finished, in other words.
The amount of work left is now 100-97.5 = 2.5.
C finishes up the remaining job in 3 days
3.5% in 3 days, to be exact.
Consequently, he will finish his entire project in 120 days.
[2.5 * 40 = 100 percent; 40 * 3 = 120 days]
If each of them got 1/3 of the deck then they would each get 7 cards
Answer:
B
Step-by-step explanation:
3 rectangles are 3 x 7 x 2 = 42
2 triangles are 2 x 1/2 x 2 x
= 2
note that you have to use Pythagoras Theorem to solve for the height of the triangle
Answer:
<em>The ball's speed will be 10 m/s at t=1.22 seconds</em>
Step-by-step explanation:
The vertical motion of an object is controlled by the force of gravity. This means that there is a non-zero net force acting on the object that makes it accelerate downwards.
If the object is thrown upwards at speed vo, its speed at time t is:

Where g is the acceleration of gravity 
Our ball is thrown upwards with v0=22 m/s. We need to calculate the time when its speed is vf=10 m/s.
Solving the above equation for t:

Substituting:

t=1.22 seconds
The ball's speed will be 10 m/s at t=1.22 seconds