Answer:
-22
Step-by-step explanation:
Due to order of operations rules, we must perform the subtraction inside parentheses first, getting:
-4 +(3)(-6)
Multiplication comes next:
-4 - 18
and the total value is thus -22.
So,
720 pt./hr.
2 pt. = 1 qt.
720/2 = 360
360 qt./hr.
Now, since there are 60 mins. in 1 hr., multiply the number by 60.
360(60) = 21600
720 pt./hr. = 21,600 qt./min.
Answer:
10.5
Step-by-step explanation:
42/4 can be reduced by dividing numerator and denominator by 2: 21/2.
This is an improper fraction. One way to obtain the equivalent mixed number would be to multiply numerator and denominator of 21/2 by 5, obtaining 105/10, which reuces to 10.5.
We could also divide 42 by 4 in the usual way, obtaining 10.5.
Answer:
√(225x^7y^9) = 15 sqrt(x^7 y^9)
Step-by-step explanation:
Answer:

Step-by-step explanation:
To find
, we need to eliminate
in this system of equations:
(1)
(2)
From (1) and (2):


Then, we equalize both expressions and solve for
:



