Answer:
d. 0.0948 ± 4.032(0.0279)
Step-by-step explanation:
A 99% confidence interval for the coefficient of promotional expenditures is, First, compute the t critical value then find confidence interval.
The t critical value for the 99% confidence interval is,
The sample size is small and two-tailed test. Look in the column headed es = 0.01 and the row headed in the t distribution table by using degree of freedom is here
for (n-2=5) degree of freedom and 99% confidence ; critical t =4.032
therefore 99% confidence interval for the slope =estimated slope -/+ t*Std error
= 0.094781123 -/+ 4.032* 0.027926367 = -0.017822 to 0.207384
Answer:
y=-4x+9
Step-by-step explanation:
y-y1=m(x-x1)
y-(-3)=-4(x-3)
y+3=-4(x-3)
y=-4x+12-3
y=-4x+9
Austin should pay $75 the first month, and 37.50 for the remaining of the 2 months
Answer:
hewo
Step-by-step explanation:
This problem has been solved! See the answer Determine Um (mode ), average U, and Urms for a group of ten automobiles clocked by radar at speeds 38,44,48,50,55,55,57,58 and 60mi/h respectively