1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
jolli1 [7]
2 years ago
6

What si the value of X?

Mathematics
1 answer:
Licemer1 [7]2 years ago
4 0

Answer:

this is a required answer.

You might be interested in
Number 2 i need help
daser333 [38]
The table you drew under the question is exactly the right way to start.

-- Make a second column, next to the 6 and 7.  This column will be
the actual number of each thing.

-- You know that there are 42 marbles, so write '42' in the box
next to the 6, on the 'Marbles' line.
Now you need to figure out what to write in the 'Stones' line, next to the 7. 

--  Look at the 'Marbles' line.  There's a 6 and then a 42.
Ask yourself: "  Self !  What does the 6 have to be multiplied with to get 42 ?" 

-- Whatever the answer is, drop down to the 'Stones' line,
and multiply the 7 by the same number.
The product is the total number of stones, and it goes in the box.
.
.
.
(The mystery number is 7.  There are 49 stones.)
6 0
3 years ago
At a copy center, 100 copies cost $4.00. At this rate how much will 450 copies cost?
vfiekz [6]
18 dollars because you do 4 x 450 and you get 1800 and that’s 18 dollars
3 0
2 years ago
Read 2 more answers
What’s the digit you need to input in the space with the question mark to complete the code for the safe? Here’s a hint to save
elena55 [62]

Answer:

4

Step-by-step explanation:

2×2=4

6÷2=3

1×2=2

8÷2=4

3×2=6

?÷2=2

2×2=4

6 0
3 years ago
Read 2 more answers
Write an equation of the line passing through point P(0,-1) that is parallel to the line y=-2x+3
irinina [24]

The answer to this question is:

y = -2x - 1

8 0
3 years ago
working together, shawn and hector can install a tile floor in 6 hours. it would take shawn 9 hours to do the job alone. what is
Vikki [24]
First, let x be the number of hours it will take for Hector to finish the same job alone. This means that every hour, Hector can do 1/x of the job. The amount of work done by Shawn and Hector in 6 hours should be equal to 1 complete work. This can be expressed as,
                      (1/9 + 1/x)(6) = 1
The value of x is 18. Thus, Hector can to 1/18 of the job in one hour. 
8 0
3 years ago
Read 2 more answers
Other questions:
  • n the United States, the average public school teacher currently earns an annual salary near $55,202. Reported national average
    6·1 answer
  • Find the surface area of the regular pyramid. Write your answer as a decimal.
    12·2 answers
  • 60 is whatpercent of 40
    8·1 answer
  • How many millimeters are in 6 <br>decimeters ​
    5·1 answer
  • Austin takes 4 hours to make 2 backpacks and a handbag. The time he takes to
    5·1 answer
  • Is this a supplementary angle or a complementary angle or neither?? number 1
    13·2 answers
  • Who else feel this ↓ ↓ :(
    8·1 answer
  • 30 km
    11·1 answer
  • The dose of a certain medication is 2 milligrams for every 80 pounds of body weight.How many milligrams of this medication are r
    12·1 answer
  • I need help. I need help. I need help. I need help. I need help. I need help. I need help. I need help. I need help. I need help
    12·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!