1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
vazorg [7]
3 years ago
8

Brainliest if correct please help

Mathematics
1 answer:
Scorpion4ik [409]3 years ago
5 0

Answer:

3/10

Step-by-step explanation:

so 1/5 probability

3 is the frequency so

10 times spun

3/10 is the answer

You might be interested in
Find the coordinates of the midpoint
love history [14]

Answer:

(2,2)

Step-by-step explanation:

(5+-1/2,8+-4/2)

(-2,2)

7 0
2 years ago
A bad contains 4 red marbles and 5 blue marbles. Two marbles are randomly drawn without replacement. Find the probability both m
kolbaska11 [484]
The probability is 2/9 because there are 9 marbles and 2 marbles were pulled out. hope I helped XD
5 0
2 years ago
PLEASE HELP ME!!!!!!!!!!!!!!!!!!
lilavasa [31]

Answer:

a) 4 - vt - d = \frac{1}{2} at^{2}

b) 1 - 2(vt - d) = at^{2}

c) 6 - \frac{2(vt - d)}{t^{2}} = a

Step-by-step explanation:

It simply asks the steps to go from the original displacement formula to isolate a (the acceleration).  It's just a matter of moving items around.

We start with:

d = vt - \frac{1}{2} at^{2}

We then move the vt part on the left side, then multiply each side by -1 (to get rid of the negative on the at side and to match answer choice #4):

vt - d = \frac{1}{2} at^{2}

Then we multiply each side by 2 to get rid of the 1/2, answer #1:

2(vt - d) = at^{2}

Finally, we divide each side by t^2 to isolate a (answer #6):

\frac{2(vt - d)}{t^{2}} = a

4 0
3 years ago
Please Help !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
Oduvanchick [21]

Answer:

26:26

Step-by-step explanation:

I hope I've helped :)

4 0
2 years ago
A company manufactures two different sizes of boat lifts. The smaller lift requires 1 hour in the welding department and 2 hours
qaws [65]

Answer:

  • The solution that optimizes the profit is producing 0 small lifts and 50 large lifts.
  • Below are all the steps explained in detail.
  • The graph is attached.

Explanation:

<u />

<u>1. Name the variables:</u>

  • x: number of smaller lifts
  • y: number of larger lifts

<u></u>

<u>2.  Build a table to determine the number of hours each lift requires from each department:</u>

<u></u>

Number of hours

                                        small lift    large lift   total per department

Welding department            1x             3y                x + 3y

Packaging department        2x             1y                2x + y

<u></u>

<u>3. Constraints</u>

  • 150 hours available in welding:         x + 3y ≤ 150
  • 120 hours available in packaging:   2x + y ≤ 120
  • The variables cannot be negative:    x ≥ 0, and y ≥ 0

Then you must:

  • draw the lines and regions defined by each constraint
  • determine the region of solution that satisfies all the constraints
  • determine the vertices of the solution region
  • test the profit function for each of the vertices. The vertex that gives the greatest profit is the solution (the number of each tupe that should be produced to maximize profits)

<u></u>

<u>4. Graph</u>

See the graph attached.

Here is how you draw it.

  • x + 3y ≤ 150
  • draw the line x + 3y = 150 (a solid line because it is included in the solution set)
  • shade the region below and to the left of the line

  • 2x + y ≤ 120
  • draw the line 2x + y ≤ 120 (a solid line because it is included in the solution set)
  • shade the region below and to the left of the line

  • x ≥ 0 and y ≥ 0: means that only the first quadrant is considered

  • the solution region is the intersection of the regions described above.

  • take the points that are vertices inside the solutoin region.

<u>5. Test the profit function for each vertex</u>

The profit function is P(x,y) = 25x + 90y

The vertices shown in the graph are:

  • (0,0)
  • (0,50)
  • (42,36)
  • (60,0)

The profits with the vertices are:

  • P(0,0) = 0
  • P(0,50) = 25(0) + 90(50) = 4,500
  • P(42,36) = 25(42) + 90(36) = 4,290
  • P(60,0) = 25(60) + 90(0) = 1,500

Thus, the solution that optimizes the profit is producing 0 smaller lifts and 90 larger lifts.

3 0
2 years ago
Other questions:
  • Two rectangular prisms have the same volume. The area of the base of the blue
    8·1 answer
  • Help with some math please!!!!!
    11·1 answer
  • (X2y3)1/2(x2y3)1/3=xa/3ya/2 where a is constant, is true for all positive values of c and y, what is value of a?
    13·1 answer
  • Write an equation that represents the line.<br> Use exact numbers.
    10·1 answer
  • (90 PTS) PLEASE HELP! PICTURE DOWN BELOW!
    11·2 answers
  • Find the equation of the line that is perpendicular to the given line and passes through the given point. Enter your answer in s
    9·1 answer
  • Armando constructs a scale model of a building with a rectangular base. His model is 3 inches in length and 1.5 inches in width.
    8·1 answer
  • Rewrite the equation by completing the square.
    7·1 answer
  • The accompanying data represent the daily​ (for example, Monday to​ Tuesday) movement of Johnson​ &amp; Johnson​ (JNJ) stock for
    5·1 answer
  • Please some urgent help!!!!
    6·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!