Answer:
41,666.67m2
Step-by-step explanation:
Call W the Width and L the Length with 3 pieces.
The total length will be 2W + 3L
The Area is L*W
so,
A = L*W
2W+3L = 1000
Solve for L
3L = 1000-2W
L = (1000-2W)/3
subtitute for L into the first equation
A = L*W
A = W*(1000-2W)/3
A = (1000W - 2W^2)/3
Now, to find the max, set the 1st derivative = 0. I don't know if you know what that means, but...
dA/dW = 1000/3 - 4W/3 = 0
1000 - 4W = 0
W = 250 meters
Solve for L
2W+3L = 1000
500 + 3L = 1000
3L = 500
L = 166.67 m
Area = 250*500/3 = 41,666.67m2.
Answer:
b = 21/15
Step-by-step explanation:
0.6+15b+4=25.6
15b + 4.6 = 25.6
15b = 25.6 - 4.6
15b = 21
b = 21/15
Test:
0.6 + 15*21/15 + 4 = 25.6
06 + 21 + 4 = 25.6
Answer:
x=1 is the correct answer
Answer:

Step-by-step explanation:


Use <em>FOIL</em> method.


Labor productivity is normally measured by (c) <u>dividing total real domestic output by the number of workers or by the number of</u><u> labor hours.</u>
<u />
<h3>What is Labour productivity?</h3>
- The total volume of production (measured in terms of Gross Domestic Product, GDP) produced per unit of labor (measured in terms of the number of employed workers or hours worked) during the course of a specific time reference period is what is referred to as labor productivity.
- Divide the total output by the total labor hours to find the labor productivity of a nation.
What is labour productivity in India?
- A measurement of labor output is labor productivity.
- Hourly productivity metrics are used. The actual Gross Domestic Product (GDP) produced by labor in an hour is what is referred to as labor productivity in macroeconomics.
- An important component of a business's overall growth is labor productivity.
Learn more about labour productivity
brainly.com/question/16690539
#SPJ4