Simplified. Employ photomath for more detailed explanation.
Answer: A, C, B
Step-by-step explanation:
Because "a" has 8 across
And "c" has 10 across
and "b" has 13 across
Answer:
The same number was not added to both sides.
Step-by-step explanation:
Given:
t - 8 = 65
in the next step it states something wrong, because it should have been this:
t - 8 = 65
add +8 left and right of the = sign.
t - 8 + 8 = 65 + 8
t + 0 = 73
t = 73
So the error made what's that
The same number was not added to both sides.
Answer:
The standard deviation of the voltage is 
Step-by-step explanation:
Problems of normally distributed samples can be solved using the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by

After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X. Subtracting 1 by the pvalue, we This p-value is the probability that the value of the measure is greater than X.
The problem states that
Assume that the voltage is normally distributed with a mean of 0, so 
A signal in a communication channel is detected when the voltage is higher than 1.5 volts in absolute value. What is the standard deviation of voltage such that the probability of a false signal is 0.05?
We know that
. This means that when
the zscore has a pvalue of 0.95. Looking at the zscore table, we have that
. So





The standard deviation of the voltage is 