The expected value of construction company is $30500.
<u>Solution:</u>
Given, A construction company is planning to bid on a building contract.
The bid costs $1,500 and has an 80% chance of being accepted.
If accepted, the company will receive $40,000 dollars.
We have to find the expected value.
We know that,
Expected value = probability
amount gained by bidding – bid amount
Expected value = 80% x 40000 – 1500
Expected value = 0.8 x 40000 – 1500
Expected value = 32000 – 1500
Expected value = 30500
Hence, the expected value is $30500.
0.9 is the answer hope it helps.
Answer: The answer is the 3rd one
Step-by-step explanation:
Answer:
24
Step-by-step explanation:
If we want to cover the base of the prism having dimensions 2 cm × 1 cm with
cm length of cube, then there will be (4 × 2) = 8 cubes that can occupy the base.
Width is 1 cm, so there can fit 2 cubes of length
cm and length is 2 cm, where 4 cubes of length
cm can fit. So, in total (4 × 2) = 8 cubes of
cm length.
Now, height of the prism is
cm where 3 cubes of length
cm can fit.
Therefore, in total there can be (8 × 3) = 24 cubes of
cm length. (Answer)