Answer:
point c is the intersection of line AB and ED
Answer is
2. 15
3.- 18
4. 92
Ten thousands place: 0
ten millions place: 3
Answer:
$10.00 per hour
Step-by-step explanation:
Overhead application rate which is also known as overhead absorption rate on the basis on labor hours is the total budgeted overhead for 2019 which is $900,000 divided by the expected production of 90,000 labor hours for the year.
overhead application rate=$900,000/90,000=$10 per hour
This implies that for every one hour worked overhead cost of $10 would be added to the other costs incurred.
The correct option then is the third option of $10.00 per hour
we are given that
two triangles are similar
so, the ratio of their sides must be same
we get

now, we can solve for x
step-1: Cross multiply both sides

step-2: Simplify left side

step-3: Subtract both sides by 2x


step-4: Divide both sides by 4

so,
............Answer