Answer:
True
Explanation:
Enterprise resource planning is the integration of various corporate functions using information technology. The main objective of a small or large manufacturing company's ERP project is to track its supply chain activities from inventory purchase to processing and final shipment to customers.
DES is a commonly used symmetric encryption
A) is a commonly used symmetric encryption
<u>Explanation:</u>
DES stands for Data Encryption Standard. It is a symmetric key algorithm and is used for encrypting electronic data. It was developed in 1975. DES is one of the oldest encryption standards to be used in the industry.
The algorithm takes 16 rounds of permutations in order to encrypt data. But now, with the advent of technology, as new algorithms have been designed and put in use, DES is less preferable.
In the process of key generation, some keys generated sometimes turn out to be weak and hence are prone to attacks. If not for the weak keys generation, DES works perfectly fine and is an effective algorithm to encrypt data.
Hardware:
-physical parts of a computer that cause processing of data
-can be connected (physically) & can touch
- Hardware wares out during/over time
-Hardware failure is random
Software:
-A set of construction that tells a computer exactly what to do
-software is logical in nature
- dose not have an increasing failure rate
Similarities
- Behavior; Users interact with the products in various ways
- Products produce outputs and given inputs
-they have functional (user facing) and non functional (non user facing) requirements
-They are both complex (any representation of product specifications lead to a main structure)
Differences
- Software is easier to change then hardware
- Software testing is done by specialized quality assurance (QA) engineers, while hardware is done by engineers who are creating the product
-Hardware must be designed and tested to work over a range of time and environmental conditions, which is not the case for software
- Hardware designs are constrained by the need to incorporate standard parts
(Hope this helps?)
Answer:
D. 30 or more
Explanation:
All other ones are canceled out ad the score adds 10.
Answer:
The answer is "Option A"
Explanation:
Escalation is the process of manipulating a bug, design failure in software program to obtain elevated access to the resources, which are usually shielded from the user, and wrong choices can be described as follows:
- In option B, It is wrong because It can't provide any type of problem-solving.
- In option C, It is wrong because it is a searching module.
- In option D, It is wrong because it is used to verify the system.