1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
andrezito [222]
3 years ago
13

Matthew bought 13 used video games that were on sale at a store. He paid $84.37 for the games. If each video game cost the same

price, how much did 1 video game cost
Engineering
2 answers:
Gre4nikov [31]3 years ago
5 0
$6.49. hoped this helped:)
gladu [14]3 years ago
5 0
$6.49 is the answer for the problem
You might be interested in
A what is marked by two sets of double yellow lines with each set having a broken line on the inside and a solid line on the out
yKpoI14uk [10]

Answer:

(C) Center left turn lanes!

Explanation:

I'm positive this answer is correct! :)

Have a nice day!

5 0
3 years ago
Robots are made up of what
Nataly [62]

Answer:

Metal

Explanation:

Metal

8 0
3 years ago
Mobility refers to the ability to?
aev [14]

Answer:

Drive

Explanation:

Drive is a great example

4 0
3 years ago
Ihhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhh
algol13

Answer:

ihhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhh

3 0
4 years ago
1. A manufacturing cell with two workers is responsible for producing a small frying pan with a required takt time of 496 second
Leya [2.2K]

Answer:

Explanation:

496=\frac{480\times 60}{demand}

demand per day = 58 pans

Due to availability of two workers we can have parallel we can have deep drawing and trimming operations simultaneously.

Hence the cycle time would be the greater time of the two operations.

cycle time = 450 seconds

\text{capacity of work cell}=\frac{\text{available working time}}{\text{cycle time}}

\text{capacity of work cell}=\frac{480\times 60}{450}

\text{capacity of work cell}=64 ~pans (which is greater than the demand of 58 pans)

Therefore the work cell has sufficient capacity and time (496 sec.>cycle time 450 sec) to meet the demand.

b)

Required daily production is 58 pans

8 0
3 years ago
Other questions:
  • Write a function which multiplies the values in odd position values by 10. Odd positions in this case refers to the first value
    11·1 answer
  • Why is transverse unequal length wishbone preferred to that of equal length?
    10·1 answer
  • When a certain motor is started, it is noticed that its supporting frame begins to resonate when the motor speed passes through
    10·1 answer
  • A banked highway is designed for traffic moving at v = 88 km/h. The radius of the curve r = 314 m. show answer No Attempt 50% Pa
    5·2 answers
  • Khái niệm về môi trường nhiệt nóng và môi trường nhiện lạnh ?
    13·1 answer
  • Identify the part of the direct current motor​
    9·1 answer
  • A defective crankshaft position sensor is a common cause of a no-start condition.
    7·1 answer
  • What’s hydraulic pressure
    6·1 answer
  • Typically each development platform consists of the following components, except:Select one:a.Operating systemb.System softwarec
    8·1 answer
  • When designing a dashboard, how can data analysts ensure that charts and graphs are most effective? Select all that apply.
    9·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!