Explain two advantages of using critical path analysis when planning production for the car engines (4 marks)

Engineering
1 answer:
MAVERICK [17]3 years ago
5 0

Answer:

The main benefits of critical path analysis

It demonstrates the graphical view of any project.

It helps to identify the most important tasks that you have to manage.

It helps to save your time and reduce timelines.

It helps to compare planned and actual progress.

It helps to make dependencies visible and clear

You might be interested in
A column has a 4.8 cm by 8.7 cm rectangular cross section and a height 4 mm . The column is fixed at both ends and has a lateral
Elden [556K]
I’m literally so sorry
3 0
3 years ago
Which emission is created by the heat in the combustion process?
Musya8 [376]
Water vapor and carbon dioxide!
5 0
3 years ago
Read 2 more answers
Which Finance jobs can someone pursue with only a high school diploma? Check all that apply.
Zolol [24]

Answer:

Teller, Loan Officer, and Tax Preparer

Explanation:

3 0
3 years ago
Read 2 more answers
Which is a better hydraulic cross section for an open channel: one with a small or a large hydraulic radius?
Cerrena [4.2K]
Hydraulic radius is caused by pressurized hydrogen air so that should mean the answer is hydraulic radius
6 0
3 years ago
Write a Python program that does the following. Create a string that is a long series of words separated by spaces. The string i
dybincka [34]

Answer:

The code is attached.

Explanation:

I created a string s including 6 colors with spaces in between. Then I converted the string into a list x by using split() method. I used three different methods for removing elements from the list. These methods are remove(), pop() and del.

\\ Then I used methods append(), insert() and extend() for adding elements to the list.

\\ Finally I converted list into a string using join() and adding space in between the elements of the list.

4 0
4 years ago
Other questions:
  • Project 8:The Harris-Benedict equation estimates the number of calories your body needs to maintain your weight if you do no exe
    5·1 answer
  • Which type of finish is absorbed into the wood?
    7·1 answer
  • Thermodynamics deals with the macroscopic properties of materials. Scientists can make quantitative predictions about these macr
    13·1 answer
  • A pool of contaminated water is lined with a 40 cm thick containment barrier. The contaminant in the pit has a concentration of
    11·1 answer
  • A heat pump with refrigerant-134a as the working fluid is used to keep a space at 25°C by absorbing heat from geothermal water t
    8·1 answer
  • A 300-ft long section of a steam pipe with an outside diameter of 4 in passes through an open space at 50oF. The average tempera
    12·1 answer
  • An atom that gained an electron is called​
    10·2 answers
  • A 1/4" nut driver with a 1.52 inch diameter handle is used to install a 14" 6 UNC
    13·1 answer
  • Find the mean deviation of the set of numbers<br> (a) 12, 6, 7, 3, 15, 10, 18,5
    7·2 answers
  • When starting up a dual fuel system, the temperature rise method for determining airflow cannot be used with the compressor cycl
    9·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!