Answer:
548 and 213
Step-by-step explanation:
Use a linear function:
Let x = 1st number
Let y = 2nd number
x+y=761
x-y=335
2x=1096
x=548
plug x into either equation
548+y=761
y=761-548
y=213
548-y=335
-y=-213
y=213
Answer:
The number is 9.5
Step-by-step explanation:
Look at the picture above, it explains everything
Answer:
Ann would need 3 h to complete the remainder of the Job.
Step-by-step explanation:
Step 1.
The "speed" that each girl has to do the work is determined as:
- Tina:
, it means that Tina complete one twelveth of the job each hour. - Ann:
, it means the Ann completes one eighth of the job each hour.
Step 2.
The amount of work done by Tina in 9 hours, is obtain multiplying by the "speed" calculated in step 1:
Amount of work done=
. It means that <em>Tina completes two thirds of the work in 9 h.</em>
Step 3.
The remaining job is calculated as
. It means that <em>still remains is one third of the job to be completed</em>.
Step 4.
The time required for Ann to complete the job is calculated dividing the remaining of the job by the "speed" of Ann to do the job.
. It means that <em>Ann would complete the job in another 3 hours</em>.
Answer:
Hi
Step-by-step explanation: