Answer:
Encumbrances $1000
Reserved for encumbraces $1000
Explanation:
Encumbrance is in the debit because is the money that we have destined for the purchase and since we have to get the money from our funds Reserved for encumbrances is in the credit.
Answer:
$39,345,664.93
Explanation:
The computation of the company worth today is as follows:
Present value of revenues after tax is
= $3,700,000 × 1.46 × (1 - 0.25) ÷ (0.07 - 0.018)
= $77,913,461.54
And, Present value of costs after tax is
= $3,700,000 × 0.82 × (1 -0.25) ÷ (0.07-0.011)
= $38,567,796.61
So, the company worth today is
= $77,913,461.54 - $38,567,796.61
= $39,345,664.93
Correct/Complete Question:
What is the time of the slowest workstation in a production system?
A. utilization
B. bottleneck time
C. effective capacity
D. throughput time
Answer:
B, bottleneck time
Explanation:
A bottleneck in a production system refers to a constraint in the production system where supply takes the longest time to meet up with demand for a particular good.
In the production processes, bottleneck time is the time takencapacity of the ful in a certain process of production as a result of the limited capacity of the process, thereby reducing the entire production chain.
Simply put, a bottleneck is a delay in time of one of the production process thereby slowing down the entire production system.
Cheers.
Answer:
=$337.43
Explanation:
The value of each of the coins after 50 years is the future value after 50 years at their respective interest rate.
The formula for future value is FV = PV × (1+r)n
For the first coin at 5.2 percent,
Fv = 100 x ( 1 + 5.2/100 ) 50
Fv =100 x (1+ 0.052) 50
Fv = 100 x 12. 61208795
Fv = $1,261. 21
For the second coin at 5.7 percent,
Fv = 100 x (1 + 5.7 /100)50
Fv =100 x (1 + 0.057 )50
Fv = 100 x 15.98
Fv = 1, 598. 64
the difference in value will be
=$1598.64 - $1,261.21
=$337.43