Answer:
Step-by-step explanation:
0.75 feet / day [ 1 day / 24 hours] * [12 inches / 1 foot]
This process is called dimensional analysis. The trick it uses is to cancel out units (like feet or days ) where possible. In this case, 1 day is going to cancel out and leave behind 24 hours. 1 foot will cancel out and leave behind 12 inches.
It is well worth learning how to do this, because the process is done in the higher sciences.
So what you are left with is
0.75 * 12 inches / 24 hours
0.75 inches /hour * 1/2
0.375 inches / hour.
If George's driveway is a rectangle 12.2 m by 3.0 m, its dimensions in cm are
... 1220 cm long × 300 cm wide × 2 cm deep
Thus the volume of gravel required is
... (1220 × 300 × 2) cm³ = 732,000 cm³
George needs about 0.732 bags, so he will probably need to buy 1 bag.
Answer:
Carmen received $7.14 for each hour she worked.
Step-by-step explanation:
$350 for 49 hours of work
Write an equation, with hours as the variable
$350 = 49h
Divide both sides of the equation by 49 to find the unit rate
h = $7.14
Carmen received $7.14 for each hour she worked.
Hope this helps :)
Isolate the k. Note the equal sign. What you do to one side, you do to the other.
First, subtract 2m from both sides
8k + 2m (-2m) = 3m (-2m) + 4
8k = m + 4
Next, divide 8 from both sides
(8k)/8 = (m + 4)/8
k = (m + 4)/8
k = m/8 + 1/2
k = m/8 + 1/2 is your answer
hope this helps
BTS is sooooo trash .....