The total cost would be $3 dollars and 48 cents because one dozen is equal to 12. Just multiply 0.29 by 12 to get $3.48.
Answer:
a 1.6 miles
Step-by-step explanation:
1/8 hour=7.5
60/7.5=8
1/5*8=1.6
So for this you will be using an exponential equation, which is
with a=initial value, b=growth/decay, y = total balance, and x = # of years
In this case, a = 500, and since with this problem the initial value is growing, you will add 100% to 6% to get 106%, or 1.06. The equation will be formed as such: 
With this problem, just plug in 15 into x and solve for y: 
In short, after 15 years Tom will have $1198.28 in his account.
Answer:
The answer is:
30 minutes.
Step-by-step explanation:
We are given the following information:
at 160 m/min, tool life = 5 min.
at 120 m/min, tool life = 17 min.
This means that as the speed reduced from 160 m/min to 120 m/min, the tool life increased from 5 min. to 17 min, hence the difference between the changes are:
speed = 160 - 120 = 40 m/min
tool life = 17 - 5 = 12 min.
Therefore, it can be concluded that a change of speed of 40 m/min, increases the tool life by 12 min.
40 m/min = 12 min
∴ 1 m/min = 12/40 min.
∴ 100 m/min = 12/40 × 100 = 0.3 × 100 =30 min.