Answer:
Maintenance Phase
Explanation:
One of the concepts employed in project management for describing stages involved when carrying out an information system development project is the systems development life cycle (SLDC). The cycle which starts from carrying out a feasibility study and ends in maintenance is a highly used conceptual model. There are 5 major stages or phase and they are the; Requirement Phase, Design Phase; Implementation Phase, Test Phase, and the Maintenance phase. The maintenance phase comes when testing has been complete and all enhancement and modifications have already been developed, and the system is operating.
Answer:
Option (A) is the right answer.
Explanation:
According to the scenario, the user system is giving the error of invalid certificate while other users on the same network do not report any error, which means that there is some problem in a particular system.
Date and time can also be one of the main cause of this error because wrong date and time creates problem in surfing many websites by giving certificate error.
Hence the most appropriate answer is option (A).
While other option are wrong because of the following reasons:
- UEFI boot mode is mainly used in booting the operating system and has no connection with network.
- Logon time is also wrong because if the problem is with the login server, it can not give certificate error.
- User access control is also not correct because it is used to control the access of the user.
I'd say in the
United States.
This United States penological practice was inaugurated in
1913 by state senator Henry Huber. Typically, under the work release program, a
prisoner who is sufficiently trusted is employed
outside the jail during working hours and returns to confinement at the end of
the shift.
<span>but of culture, values and traditions. Cultura</span>