1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
noname [10]
3 years ago
12

Natalie bought 5 hot chocolates for $25. How much was each hot chocolate?

Mathematics
1 answer:
elena-s [515]3 years ago
7 0

Answer:

5

Step-by-step explanation: 5x5 =25$

You might be interested in
What does the 5 in the decimal .257 represent
Ira Lisetskai [31]

Answer: five hundredths

6 0
3 years ago
Choose the set of measurements listed in order from greatest to least. A. 20 kl, 20 L, 20 ml B. 20 L, 20 ml, 20 kl C. 20 ml, 20
Alex17521 [72]

Answer: A

Step-by-step explanation:

First, we know that each set has 20 kL, 20 L, and 20 ml. To know if they are in the order from greatest to least, we should make sure all three have the same units. Once we do, we can put them in order.

20 kL=20000 L

20 mL=0.02 L

20 L=20L

Now that we have made sure the units are all the same, we know that 20 kL is the greatest and 20 mL is the smallest. The final order is 20 kL, 20 L, 20 mL.

4 0
3 years ago
What’s the answer a) b) c) or d)
Ivan

Answer:

b ummm is this even a question?

8 0
3 years ago
The critical path for the project has an expected duration of 112 days, and a standard deviation of 5 days. The probability of f
leonid [27]
<h2>Answer with explanation:</h2>

Given : The critical path for the project has an expected duration of 112 days, and a standard deviation of 5 days.

i.e. \mu=112\ ;\ \sigma=5

We assume that this a normal distribution.

Let x be the random variable that represents the time duration to complete the project.

z-score : z=\dfrac{x-\mu}{\sigma}

For x= 115

z=\dfrac{115-112}{5}=0.6

P-value : P(z

Thus, the probability of finishing on time if the due date is 115 days is 0.726.

Also, for x= 120

z=\dfrac{120-112}{5}=1.6

P-value : P(z>120)=P(z>1.6)=1-P(z

1-0.9452007=0.0547993\approx0.055

Hence, the probability that they will have to pay the penalty is 0.055 .

5 0
3 years ago
What properrty is shown? 4+(3+2)=4+(2+3)
BabaBlast [244]
The commutative property is shown. It states that an equation has the same value as it would even if the numbers were mixed. In this equation, the 2 and the 3 are switched within the parentheses, so it still has the same value.

6 0
3 years ago
Read 2 more answers
Other questions:
  • A circular pond 20m in diameter is surrounded by a gravel path 5m wide. The path is to be replaced by a brick walk costing $30 p
    8·2 answers
  • During the grand opening of an electronics store, any customer has an 11% chance of winning a free laptop. What is the chance th
    9·2 answers
  • Solve the inequality y^2-3y greater than 18 sorry couldn't find the greater than sign
    8·2 answers
  • Is 2/3 greater than 10/18
    14·2 answers
  • <img src="https://tex.z-dn.net/?f=1%2F3%20%2812x%20-%2024%29%20%3D%2016" id="TexFormula1" title="1/3 (12x - 24) = 16" alt="1/3 (
    11·1 answer
  • F(x) = x3 - 2x2 + x - 2
    9·1 answer
  • Which of the following terms is best described as the point halfway between
    15·1 answer
  • Can someone please help me solve this :)
    10·1 answer
  • Awnser this quick please
    6·2 answers
  • Write always, sometimes, never to fill in the following blanks. 16. A whole number is a natural number. 17. A fraction is 18. A
    10·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!