1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Nezavi [6.7K]
2 years ago
8

Geometry question 14

Mathematics
1 answer:
aksik [14]2 years ago
4 0

Answer:

b 125

Step-by-step explanation:

You might be interested in
Solve the system.
Rainbow [258]
The answer A.the solution is (5,-2) definitely works because 5+-2=3 and 5--2=7 not sure if there's infinite number of solutions tho
8 0
2 years ago
Graph the line with slope 7 and y-intercept -7
poizon [28]

<u>Given</u><u> </u><u>:</u><u>-</u>

  • To graph the line with slope 7 and y intercept -7.

<u>To </u><u>Find</u><u> </u><u>:</u><u>-</u>

  • The graph of the line .

<u>Solution</u><u> </u><u>:</u><u>-</u>

Here since the slope of the line is 7 and y intercept is -7 , we can use the slope intercept form of the line to find the equation of the line . The slope intercept form of the line is ,

\longrightarrow y = mx + c

On putting the respective values ,

\longrightarrow y = 7(x) + (-7)

\longrightarrow y = 7x - 7

<u>For</u><u> </u><u>the</u><u> </u><u>graph</u><u> </u><u>see </u><u>attachment</u><u> </u><u>.</u>

6 0
2 years ago
Expect a ton of trigonometry questions from this account. i know absolutely nothing
Paha777 [63]

Answer:

see attached formulas

Step-by-step explanation:

Math is beautiful. Have fun learning.

8 0
2 years ago
Assume that after t hours on the job, a factory worker can produce 100te^-.5t units per hour. How many units does the worker pro
VMariaS [17]
The number of units produced by the worker during t hours of work can be modelled by the following function:

N(t)=100t e^{(-0.5t)}

To find the number of units produced during first 3 hours, we can substitute 3 for t. This will give us the number of units produced by the worker during first 3 hours.

N(3)=100(3) e^{-0.5(3)} = 67

Thus the worker will produce 67 units during the first 3 hours of the work. 
5 0
3 years ago
What numbers have an absolute value of 2 1/2
olasank [31]
2 1/2 and -2 1/2 beacause negative absolute value is the same number without negative sign

3 0
3 years ago
Read 2 more answers
Other questions:
  • You work in a grocery store warehouse recording shipments. A driver delivers 25 crates of strawberries for distribution. A store
    5·1 answer
  • Harold rented a steam cleaner to clean his carpets. There was a charge for cleaning solution and a daily rental charge for three
    8·1 answer
  • Imagine working with a younger sibling or student who is having trouble with the 9 times table. Create an algorithm to help the
    9·2 answers
  • What is the leading coefficient of the polynomial?<br><br> 12 − 6x3 − 9x2 − 15x
    15·2 answers
  • G(x) = x3 + 6x2 + 12x + 8<br><br><br><br> Determine the function’s value when x = −1.
    15·1 answer
  • Suppose the dealer incentive per vehicle for honda's acura brand in 2012 is thought to be bell-shaped and symmetrical with a mea
    7·1 answer
  • I don't know how to plug in 1,5,10 for a function
    6·1 answer
  • I need help on 13 I will give you 10 points but pls explain it
    9·1 answer
  • Simplify the expression:<br> 7r2+5r2+9r
    10·2 answers
  • Suppose PQ has one endpoint at
    11·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!