Answer:
Cost, C = $28410.72
Step-by-step explanation:
We have, a concrete pillar has the shape of a cylinder.
Diameter of pillar is 8 m and ts height is 9 m
If concrete costs $87 per cubic meter, it is required to find the concrete cost for the pillar. For this lets find the area of cylindrical shape. So,

The cost of pillar at the rate of $87 per cubic meter will be :

Just plug in -3 for x. So it will be -(-3)^+ 1
Which is 3^+1.
I'm confused by your ^ sign I'm not sure if this is supposed to be squared or not...? But just solve/simplify the equation.
Hope this helps!
4. Period with the digits 913 is called thousands period.
5. The digit in the ten thousand place is 1.
6. The value of 9 is hundred thousands.
Hope it will help you :)
The standard deviation is 1, I believe...
Answer:
23Ib9 oz
Step-by-step explanation:
13+10=23
7+2+9