Answer:
Instructions are listed below.
Explanation:
Giving the following information:
Direct Labor Variances Dvorak Company produces a product that requires 3 standard hours per unit at a standard hourly rate of $17 per hour. If 1,000 units required 2,800 hours at an hourly rate of $16.50 per hour.
A)
Direct labor price variance= (SR - AR)*AQ
Direct labor price variance=(17 - 16.5)*2,800= 1,400 favorable
B) Direct labor efficiency variance= (SQ - AQ)*standard rate
Direct labor efficiency variance= (3,000 - 2,800)*17= 3,400 favorable
C) Total direct labor variance= -1400 - 3400= -4,800 favorable
Based on his perception of the differences in the shades,
this can be attributed to the wavelengths of light reflecting from the shades.
Wavelength in physics is being defined as measuring the direction in regards of
the propagation of a wave in which are in between a two successive points in
the wave that are being characterized by its same phase.
C sounds most correct.
please vote my answer branliest! Thanks.
Answer:
$270,000
Explanation:
Contribution per kite = $6.50 - $3.50 = $3.00
Break even point = 90,000 kites
Since;
Break even point = Fixed cost / Contribution per kite.
We have:
90,000 = Fixed cost / $3.00
Fixed cost = 90,000 * $3.00 = $270,000
Therefore, Ocean City Kite Company's fixed costs is $270,000.