1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
professor190 [17]
3 years ago
10

The taillight of a car is in the shape of a kite whose diagonals are both 15 centimeters. How many square centimeters does the k

ite occupy?
30
56.25
112.5
225
Mathematics
2 answers:
Leya [2.2K]3 years ago
8 0

Answer:

30!!!

Step-by-step explanation:

max2010maxim [7]3 years ago
3 0
The answer is 30
Have a great day!!
You might be interested in
On Sunday, Dan collected 6.8 pounds of aluminum for recycling. On Monday he collected another 8.75 pounds. What is the total num
Tresset [83]
6.8 + 8.75 = 11.55

Dan collected a total of 15.55 pounds of aluminum.
6 0
3 years ago
Read 2 more answers
. The time required for a technician to machine a specific component is normally distributed with a mean of 2 hours and a standa
erma4kov [3.2K]

Answer:

a) There is a 3.84% probability that the technician can machine one component in 1.5 hours or less.

b) There is a 0.42% probability that the technician will require at least 2.75 hours to complete one component

Step-by-step explanation:

Problems of normally distributed samples can be solved using the z-score formula.

In a set with mean \mu and standard deviation \sigma, the zscore of a measure X is given by

Z = \frac{X - \mu}{\sigma}

After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X.

In this problem, we have to be careful. The mean is in hours, while the standard deviation is in minutes. I am going to work with both in hours, as the problem states. 17 minutes is 0.283 hours, so:

\mu = 2, \sigma = 0.283

(a.) What is the probability that the technician can machine one component in 1.5 hours or less?

This probability is the pvalue of the Zscore when X = 1.5. So:

Z = \frac{1.5 - 2}{0.283}

Z = \frac{-0.5}{0.283}

Z = -1.77

Z = -1.77 has a pvalue of 0.0384.

This means that there is a 3.84% probability that the technician can machine one component in 1.5 hours or less.

(b.) What is the probability that the technician will require at least 2.75 hours to complete one component?

The pvalue of the score of X = 2.75 is the probability that the technican will require less than 2.75 hours to complete one component. The probability that he will require at least 2.75 hours to complete one component is 1 subtracted by this pvalue. So:

Z = \frac{2.75 - 2}{0.283}

Z = \frac{0.75}{0.283}

Z = 2.65

Z = 2.65 has a pvalue of 0.99598.

This means that the probability that the technican will require at least 2.75 hours to complete one component is 1 - 0.99598 = 0.0042 = 0.42%.

4 0
4 years ago
Make a copy of this document for yourself. Solve each problem. Remember to combine like terms and use inverse operations when ne
Bond [772]

Answer:

the answer is 5.

given, 2c-7c+8=-17

or, -5c=-17-5

or, c=-25/-5

therefore the value of c is 5...

6 0
3 years ago
Read 2 more answers
What is the missing number plus 6000,00= 607,000​
S_A_V [24]

Answer:

7,000

Step-by-step explanation:

607,000 - 600,000 = 7,000

7 0
3 years ago
Read 2 more answers
51,988 rounded to the nearest ten thousand is.
egoroff_w [7]
1) 50000

2) 770000

because you look at the place value before the 10,000 place and if it's above 4, then you round up. if it's below 5, you round down.
7 0
4 years ago
Other questions:
  • Please please help me out if you know how to do this!
    8·1 answer
  • Pls help me make you brainliest<br> 8:00 am in espanol please translate correctly
    9·2 answers
  • You launch a ball at an angle of 35 degrees above the horizontal with an initial velocity of 38 m/s. What is the time the ball w
    14·1 answer
  • I really really really really really need help in a huge rush
    15·1 answer
  • Identify and describe the transformation " (x,y) to (x+4,y-6)
    14·1 answer
  • Subtract 1/4w+4 from 1/2w+3.<br><br> A. −14w+7<br><br> B. −14w+1<br><br> C. 14w+7<br><br> D. 14w−1
    11·2 answers
  • If triangle ABC is defined by the coordinates A(3, 6), B(7, 6), C(7, 3) is dilated by a scale factor of 3, with resulting vertex
    15·2 answers
  • How do I solve x^2+11x+28=0
    14·1 answer
  • P(x)=x4-52+9x+8 Hallar p(-3)
    7·1 answer
  • In a retail setting, payroll is often based on projected sales. If your payroll budget is 6% of projected sales of $3500.00 and
    5·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!