Answer:
All the members of a construction crew work at the same pace. Four of them working together are able to pour concrete foundations in 32 hours.
Step-by-step explanation:
Answer: S = 50W + 75
Step-by-step explanation:
I got to this answer by a bit of trial and error.
I first noticed that the relationship between the balance in the savings account from week to week was increasing by 50.
But when I tried W = S + 50, that did not work at all because when I plug in 125 for S, I should get 1 for W, but instead I get 175. So I realized I had something backwards.
I then tried listing the relationship as ordered pairs of (W, S).
For example I did (1, 125), (2, 175), (3, 275) and so on. So I thought of S like y and W like x where S is a function of W. I used the equation y = mx +b or S=mW + b as an outline. I figured that W would have to be multiplied by 50 to get that jump between the numbers in the S column. But I could not do S=50W + 125 because if W = 1, S = 175 when S should equal 125. So I subtracted 50 from the 125 and got 75. So my final equation was S=50W+75. If you test it with the ordered pairs listed above, you will see that the equation checks out. Try it yourself! I hope this was helpful in some way. Good luck!
Answer:
65 dinners are expected to show up
The standard deviation of the distribution is 3.13
Step-by-step explanation:
Given
Proportion = 15%
Population = 77
Required
Expected Number that'll show up
Standard Deviation
<em>If 15% won't show up; then</em>
<em>100% - 15% = 85% will show up</em>
Expected Number, E(x) of Dinner is calculated as thus;

Where
(calculated above)
and 
Convert p to decimal

So;



<em>65 dinners are expected to show up</em>
Calculating Standard Deviation, SD
Standard Deviation is calculated as;

Substitute 0.85 for p and 77 for n




(Approximated)
<em>The standard deviation of the distribution is 3.13</em>
Answer:
California July 31, 2013 This article is more than 2 years old. Last week, after the Nexus 7 ... I think it's always a mistake to assume that technology will be static.
Step-by-step explanation:
hope i helped:)
Answer:
Option C (f(x) =
)
Step-by-step explanation:
In this question, the first step is to write the general form of the quadratic equation, which is f(x) =
, where a, b, and c are the arbitrary constants. There are certain characteristics of the values of a, b, and c which determine the nature of the function. If a is a positive coefficient (i.e. if a>0), then the quadratic function is a minimizing function. On the other hand, a is negative (i.e. if a<0), then the quadratic function is a maximizing function. Since the latter condition is required, therefore, the first option (f(x) =
) and the last option (f(x) =
) are incorrect. The features of the values of b are irrelevant in this question, so that will not be discussed here. The value of c is actually the y-intercept of the quadratic equation. Since the y-intercept is 4, the correct choice for this question will be Option C (f(x) =
). In short, Option C fulfills both the criteria of the function which has a maximum and a y-intercept of 4!!!