Answer: 8 minimum work stations is what would be needed.
Step-by-step explanation:
The cycle time is computed as the operating time daily divided by the scheduled output.
It is important to note that the daily capacity of the operation layout is the operating time divided by the cycle time.
Therefore,
If you need to produce 30units/hour.
The average cycle time is as follow:
The average cycle time is the average time between the completions of units.
60/30= 2 average cycle time
=16/2
=8
8 work stations is the minimum number that would be needed.
It is important to know that in an assembly line balancing, the minimum number of work station is the ratio of the sum of all tasks time to the cycle time.
Answer:
(5,-4)
Step-by-step explanation:
Move the point T three units to the right. It's (x, y), so (5,-4) is the answer.
Perpendicular lines refers to a pair of straight lines that intercept each other. The slopes of this lines are opposite reciprocal, meaning that it's multiplication is -1.
On this case they give you the equation of a line and a point, and is asked to find the equation of a line that is perpendicular to the given one, and that passes through this point.
-2x+3y=-6 Add 2x in both sides
3y=2x-6 Divide by 3 in both sides to isolate y
y=2/3x-6/3
The slope of the given line is 2/3, which means that the slope of a line perpendicular to this one, needs to be -3/2. Now you need to find the value of b or the y-intercept by substituting the given point into the formula y=mx+b, where letter m represents the slope.
y=mx+b Substitute the given point and the previous slope found
-2=(-3/2)(6)+b Combine like terms
-2=-9+b Add 9 in both sides to isolate b
7=b
The equation that represents the line perpendicular to -2x+3y=-6 and that passes through the point (6,-2), is y=-3/2x+7.
It is not likely because it is less then 50% which 50 is half and 25% is 1/4 chance.
Answer:
Step-by-step explanation:
what r u tyring to find there is no question,
answer this and i really can help.