Answer:
The answer 55
Step-by-step explanation:
Because it goes up by five for they gave us the amount of point they get for 5 hours and the amount of point he had for 5 hours was 50 so we just needed to add 5 more and 50+5= 55
I don't know if I made myself clear but good luck! :)
Step-by-step explanation:

Apply Quoteint of Powers. Divide the intergers. serpately.
Note that Quotient of Powers is

So the answer is

The answer is

or

Answer:
10 + (2 x 3)^2 / 4 x (1/2) ^3
First do the parentheses
2 x 3 = 6
1 / 2 = 0.5
We are left with
10 + 6^2 /4 x 0.5^3
Do exponents
6 x 6 = 36
0.5 x 0.5 x 0.5 = 0.125
10 + 36 / 4 x 0.125
Divide by 4 and multiply by 0.125
36 / 4 = 9
9 x 0.125 = 1.125
We are left with
10 + 1.125 = 11.125
The answer is 11.125
Step-by-step explanation:
To solve this problem, we are going to use the percent proportion, a/b = p/100, where a is the part of a number b, the whole, and p is the percentage out of 100.
When we fill in our known integers into this equation, we get
21.12 / b = 25.6 / 100
Next, to simplify this equation, we should use cross products (means - extremes products theorem). This means multiplying the numerator of one fraction and the denominator of the other fraction and setting them equal to one another.
21.12(100)=25.6(b)
When we multiply, you get
2112 = 25.6b
Finally, we divide both sides by 25.6, to get our variable b, alone, and without a coefficient.
82.5 = b
Therefore, 25.6% of the number 82.5 is 21.12.
Answer:
His jump was of 272.45 inches
Step-by-step explanation:
Problems of normally distributed samples are solved using the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this problem, we have that:

75th percentile
X when Z has a pvalue of 0.75. So X when Z = 0.675




His jump was of 272.45 inches