1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
mariarad [96]
3 years ago
9

The industrial revolution contributed to the pollution that we see today

Social Studies
1 answer:
Trava [24]3 years ago
7 0
True, the amount of pollutants produced during the industrial revolution has greatly affected our world today.


hope this helps
You might be interested in
Revise the following sentences to reduce bias (e.g., gender, racial, ethnic, age, and disability).
xenn [34]

1) In 18 or more states, the employees have the right to view their employee records.

2) Media Moguls hired Charissa Love, who belongs to America, for the position of social media coordinator.

3) Skilled assistants proofread their boss's documents and catch any errors they make.

4) Curtis is diagnosed with crippling arthritis, yet he manages to work well.

5) Recently appointed to the commission are a lawyer, a CPA from Nigeria and two business-person.

6) The conference in the Bahamas offers special side trips for the spouses of executives.

8 0
3 years ago
I NEED HELP ASAP CAN SOMEONE HELP ME<br><br>i put a file in so you can find the answer
ad-work [718]

Answer:

veto ans. last choice

constitution ans. second choice

separation of powers ans. third choice

popular sovereignty ans. fourth choice

follow me for moree

5 0
3 years ago
Why is the Upper Tamakoshi Hydro Project called as a project of National Pride? in which sectors of national development are dir
sergejj [24]

Explanation:

The Upper Tamakoshi hydroelectric power station is a 456MW run-of-the-river project under construction on the Tamakoshi River in the Dolakha District, approximately 200km away from Kathmandu, Nepal.

Construction on the Upper Tamakoshi hydropower project was started in 2011 and was expected to be completed within six years. The project’s progress was, however, hampered due to an earthquake in April 2015. The facility is currently scheduled for commissioning by the end of 2019.

The developer and operator of the project is Upper Tamakoshi Hydropower Limited, an autonomous company established by Nepal Electricity Authority (NEA) in March 2007.

The Upper Tamakoshi hydropower station is expected to produce 2,281GWh of electricity a year.

Upper Tamakoshi hydropower plant make-up

Upper Tamakoshi comprises a 22m-high and 60m-long concrete dam, two 225m-long de-sanding basins, an 8.4km-long headrace tunnel with 32.14m² of cross-sectional area, and an underground powerhouse (142m-long, 13m-wide, and 25m-high) equipped with six Pelton turbine units.

“The Upper Tamakoshi hydropower station is expected to produce 2,281GWh of electricity a year.”

The gross head height of the dam is 822m. Design flood and discharge capacities for the facility will be 885m³/s and 66m³/s, respectively.

Live storage capacity of the dam will be 1.2 million cubic metres. The 2.9km-long tailrace tunnel of the project will have a cross-sectional area of 35m².

Transmission and power purchase agreement

The power generated by the Upper Tamakoshi hydropower plant will be fed into the national grid through a 49km-long double circuit 220kV transmission line between Gongar and the Khimti power station.

The Nepal Electricity Authority (NEA) and Upper Tamakoshi Hydropower Limited signed a draft power purchase agreement (PPA) for the project in 2011. The NEA agreed to purchase the power output of the plant at a yearly average rate of NPR3.50 a unit.

Contractors involved

Norconsult and Lahmeyer provided detailed project design, construction management and monitoring services for the project.

The civil works contract for the project was awarded to Sinohydro Corporation. Andritz Hydro was awarded the contract for the design, manufacturing, and supply of electromechanical equipment, including turbines and generators for the project.

KEC International was contracted for the supply and erection of transmission lines as well as the substation.

Texmaco, an engineering and infrastructure company based in India, was engaged for the hydro-mechanical works for the project.

Financing

The total construction cost of the project was estimated to be NPR35.29bn ($441m) in 2011. Loans were extended by Nepal’s Employees’ Provident Fund ($131.6m), Nepal Telecom ($78.97m), Citizen Investment Trust ($26.32m), and Rastriya Beema Sansthan (RBS, $26.32m) to finance the project.

The Government of Nepal committed to providing a loan of up to NPR11.08bn ($145.8m) for the project.

The project cost has been reportedly escalated by $41.8m due to the delay and disruption caused by the 2015 earthquake.

Related Projects



Balaoi & Caunayan Wind Farm, Ilocos Norte, Phillippines

The Balaoi & Caunayan Wind Farm is an onshore wind farm project under construction by AC Energy in partnership with…

10 Jun 2021



Mutriku Wave Energy Plant

The Mutriku wave energy plant was officially commissioned by Spanish utility Ente Vasco de la Energía (EVE) in the Basque…

07 Jun 2021



Mutkalampi Wind Farm, Central and Northern Ostrobothnia, Finland

Mutkalampi is a proposed 404MW wind farm to be built in Finland by French renewable energy developer Neoen and Prokon…

04 Jun 2021



Rabigh-2 Combined-Cycle Power Plant

The 2,060MW combined-cycle Rabigh-2 independent power project (IPP) is located next to the 1,024MW Rabigh-1 power plant, 130km north of…

04 Jun 2021

Join Our Newsletter

Energy news and in-depth feature articles on the latest energy provider deals, energy innovations and trends in renewables, solar power, offshore wind, hydropower, coal and nuclear power

Receive our newsletter

Sign up to our e-Newsletter here

About us

Editorial Approach

Contact Us

Privacy Policy

Terms and Conditions

© Copyright Verdict Media Limited 2021

Powered by 

We use cookies to ensure that we give you the 

6 0
3 years ago
Which of the following is a description of the judicial system in the district of columbia?
Luden [163]
D. Two federal courts and a local trial court, but no local court of appeals
4 0
3 years ago
Read 2 more answers
Which two of the following inspired american government?
ryzh [129]
The single most important influence that shaped the founding of United States comes from John Locke a 17th century Englishman who redefined the nature of government
8 0
2 years ago
Other questions:
  • PLZ put the answer QUICKLY!!!! I will give Brainliest.
    15·1 answer
  • WHERE DID MARTHA WASHINGTON LIVE AS A CHILD
    15·2 answers
  • Jeff is preparing to create a commercial for a new energy drink. he visits a local high school and surveys students in an englis
    7·1 answer
  • How has mexico's culture been shaped by cooperation among different people?
    7·1 answer
  • The countries of Belize and Jamaica have a parliamentary system of democracy. This means
    8·1 answer
  • The __________ is the source of the interpersonal communication the person who originates the communication encounter. Loudest s
    12·1 answer
  • 4. Which is NOT a vital situation that requires "superior parenting"?
    11·1 answer
  • 2. Why did most colonies resent being under foreign control?
    12·1 answer
  • The animal that represented the central part of the Cheyenne culture was the
    5·1 answer
  • How did Socrates challenge the values of the people of Athens
    14·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!