Answer:
a. The percentage of vehicles who pass through this construction zone who are exceeding the posted speed limit =90.82%
b. Percentage of vehicles travel through this construction zone with speeds between 50 mph and 55 mph= 2.28%
Step-by-step explanation:
We have to find
a) P(X>40)= 1- P(x=40)
Using the z statistic
Here
x= 40 mph
u= 44mph
σ= 3 mph
z=(40-44)/3=-1.33
From the z-table -1.67 = 0.9082
a) P(X>40)=
Probability exceeding the speed limit = 0.9082 = 90.82%
b) P(50<X<55)
Now
z1 = (50-44)/3 = 2
z2 = (55-44)/3= 3.67
Area for z>3.59 is almost equal to 1
From the z- table we get
P(55 < X < 60) = P((50-44)/3 < z < (55-44)/3)
= P(2 < z < 3.67)
= P(z<3.67) - P(z<2)
= 1 - 0.9772
= 0.0228
or 2.28%
True, all of them represent a negative number, for example:
You have $60 and you spent $10, the remaining money is:

Your savings are $1000 and you make a Withdrawal of $500:

In other words for calculation purposes, they all have negative values
Answer:
They are (6, 1) or (3, 2).
Step-by-step explanation:
The factor pairs of 6 are 1×6 and 2×3
So the parallelogram (height by length) could be:
1 by 6
2 by 3
3 by 2
6 by 1.
Area = 91 in²
Step-by-step explanation:
Hope it helps you!
<h2><em>JUST DO IT YOURSELF ITS BASIC FRACTIONS!!!!!!!!!</em></h2>