6 - p....p = 1.5
6 - 1.5 = 4.5
TRUE...because when u sub in 1.5 for p, the difference is 4.5, which is less then 5.
(30)(420) = 12000 - 600
12600 = 11400...incorrect
FALSE...because the product of 30 and 420 does not equal 600 less then 12000
16.3 + 11.9 < 27
28.2 < 27..incorrect
FALSE...because the sum of 16.3 and 11.9 is greater then 27
Total cost job=
Retail price of parts+labor cost+manufacturing overhead
Total cost job 82
Retail price of parts 0
Labor cost=7.5×6.5=48.75
Manufacturing overhead ?
82=0+48.75+?
?=82−48.75
?=33.25
Manufacturing overhead is 33.25
Now find manufacturing overhead rate from the cost of labor
33.25÷48.75=0.682×100=68.2%
The answer 68.2%
Answer: the answer is when the unit rate is a lower cost then the other unit rate.
Step-by-step explanation:
Answer:
A. (x + 2)²(x - 2)²
Step-by-step explanation:
x⁴ - 8x² + 16 =
(x² - 4)(x² - 4) =
(x - 2)(x + 2)(x - 2)(x + 2) =
(x - 2)²(x + 2)²