9 - 3 = 6
J + 6 < 8 subtract 6 from both sides
J + 6 - 6 < 8 - 6
J < 2
9514 1404 393
Answer:
9 weeks
Step-by-step explanation:
In problems of this nature, the usual assumption is that the time required is proportional to the work product and inversely proportional to the number of people doing the job. Here, there is no change in the amount of work, but the number of people is reduced by a factor of 12/18 = 2/3.
So, the amount of time required is expected to increase by a factor of 1/(2/3) = 3/2.
(6 weeks)×(3/2) = 9 weeks
It would have taken 9 weeks to sew the 540 dresses.
Answer:
H
Step-by-step explanation:
Step-by-step explanation:
given a slope and a point that the line passes through you have 2 options
Option 1: Solve for the equation of the line so you can just use that to graph the line. In this scenario it would be y=(-5/2)x - (20/13)
Option 2: plot the given point and, based on the slope, plot the next point that it crosses. In this case the next point would be (5, 7). Then you can just draw a line using these 2 points.