Answer: B and C
Hope this help :)
8x8x8 or 8 with the power of 3
The answer is B. Complete information.
A sample means only part of the whole. From the day the email was created till it was cancelled is the whole population. Consider that no mails will no longer go in because it is closed so no more additional information or data will enter that category. So it would be considered as complete. If the situation were to ask from one point to another before it was cancelled it would be considered as a sample.
Answer:
a. 1 1/8 b. 8/9
Step-by-step explanation:
You can set this up as a proportion to solve. For part a. we know that 2/3 of the road is 3/4 mile long. 2/3 + 1/3 = the whole road, so we need how many miles of the road is 1/3 its length. Set up the proportion like this:

Cross multiplying gives you:

The 3's on the right cancel out nicely, leaving you with

To solve for x, multiply both sides by 3/2:
gives you

That means that the road is still missing 3/8 of a mile til it's finished. The length of the road is found by adding the 3/4 to the 3/8:

So the road is a total of 1 1/8 miles long.
For b. we need to find out how much of 1 1/8 is 1 mile:
1 mile = x * 9/8 and
x = 8/9. When 1 mile of the road is completed, that is 8/9 of the total length of the road completed.
-8m^3 + 11m....notice that it has 2 terms....(-8m^3) and (11m). Having 2 terms makes it a binomial...if it would have had 3 terms, it would have been a trinomial. If it has only one variable, the degree is the highest exponent...so this has a degree of 3 since ^3 is the highest exponent.
so ur answer is : binomial with a degree of 3