1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
vodka [1.7K]
3 years ago
15

Jack is a plumber and uses the below formula to calculate how much he charges the customer.

Mathematics
1 answer:
never [62]3 years ago
5 0

Answer:

Cost = 42 pounds

Step-by-step explanation:

Cost = 5 x 4 + 22

Cost = 42 pounds

You might be interested in
PLEASE HELP! No links please. Will make brainliest answer
maria [59]

Answer:

36

Step-by-step explanation:

Angle BEC is a right angle. The total degree of a right angle is 90. So if you subtract 90 by 54, then you get the value of the remaining angle, which is 36.

7 0
3 years ago
Help!!! I need help figuring out these problems for a geometry eoc please please help
kipiarov [429]
I don't know how to solve for the measures of each angle but I can tell what type of angles each of these are. (a) obtuse angle, (b) not sure, (c) not sure, (d) The relationship between the angles BA and BE is that together they form a right angle. And #3, I cannot helps with. Very, sorry that I was not able to answer all of your question. Hope this helps!
5 0
3 years ago
An oil drilling company drills the same distance each day for 5 days. They started at an elevation of 121.175 feet and ended at
nirvana33 [79]

Answer:

x=\dfrac{|-246.875-121.175|}{5}

Step-by-step explanation:

Given that:

Same distance is drilled by the oil drilling company for 5 days.

Initial elevation = 121.175 feet

Final elevation = -246.875 feet

To find:

The equation to find the value of x i.e. the distance drilled each day?

Solution:

To find the distance drilled each day, we need to divide the total distance drilled with the number of days taken to drill the total distance.

Total distance drilled can be found by subtracting the initial elevation from the final elevation and taking modulus because distance can not be negative.

Total distance drilled = | Final elevation - Initial elevation |

Total distance drilled = | -246.875 - 121.175 |

Therefore, we can write the expression as:

x=\dfrac{|-246.875-121.175|}{5}

\Rightarrow x=\dfrac{|-368.05 |}{5} =73.61\ ft/day

3 0
3 years ago
The probability that a certain make of car will need repairs in the first seven months is 0.9. A dealer sells three such cars. W
aleksandr82 [10.1K]

Answer:

0.9990 = 99.90% probability that at least one of them will require repairs in the first seven months.

Step-by-step explanation:

For each car, there are only two possible outcomes. Either they will require repair in the first seven months, or they will not. The probability of a car requiring repair in the first seven months is independent of other cars. So we use the binomial probability distribution to solve this question.

Binomial probability distribution

The binomial probability is the probability of exactly x successes on n repeated trials, and X can only have two outcomes.

P(X = x) = C_{n,x}.p^{x}.(1-p)^{n-x}

In which C_{n,x} is the number of different combinations of x objects from a set of n elements, given by the following formula.

C_{n,x} = \frac{n!}{x!(n-x)!}

And p is the probability of X happening.

The probability that a certain make of car will need repairs in the first seven months is 0.9.

This means that p = 0.9A dealer sells three such cars.

A dealer sells three such cars.

This means that n = 3

What is the probability that at least one of them will require repairs in the first seven months?

Either none will require repairs, or at least one will. The sum of the probabilities of these events is decimal 1. So

P(X = 0) + P(X > 0) = 1

We want P(X > 0). So

P(X > 0) = 1 - P(X = 0)

In which

P(X = x) = C_{n,x}.p^{x}.(1-p)^{n-x}

P(X = 0) = C_{3,0}.(0.9)^{0}.(0.1)^{3} = 0.001

Then

P(X > 0) = 1 - P(X = 0) = 1 - 0.001 = 0.9990

0.9990 = 99.90% probability that at least one of them will require repairs in the first seven months.

4 0
3 years ago
Use only positive exponents in your answer.
EleoNora [17]

Answer:

1/(72x^11)

Step-by-step explanation:

Multiply like terms and according to rules of exponenets, add exponents which are multiplied.  If you have a negative exponent, then put the reciporical of it and you end up with 1/(72x^11).

Please mark for Brainliest!! :D Thanks!!

For more questions or more information, please comment below!

5 0
3 years ago
Other questions:
  • A lawn mower manufacturer incurs a total of $34,816 in overhead costs and $388 per lawn mower in production costs. How many lawn
    5·1 answer
  • Please help! Correct answers only please!
    7·2 answers
  • The phrase the difference between a number and four can be written as which variable expression
    10·1 answer
  • Equivalent expression of 3z+ 2+( -5z) + 6
    12·1 answer
  • Write 740% as a decimal and as a mixed number.
    9·2 answers
  • Which equation can be used to find AB?
    7·2 answers
  • 1. Which two points lie on a line with slope 2/3?
    6·2 answers
  • If andy pays 450 of the rent and mo pays 1/2 of the rent and charlie pays 25percent of the rent what is the overall rent
    7·1 answer
  • Solve for x. Round your answer to the nearest tenth. 19, 17
    7·1 answer
  • <img src="https://tex.z-dn.net/?f=x%5E2%3D36" id="TexFormula1" title="x^2=36" alt="x^2=36" align="absmiddle" class="latex-formul
    6·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!