Answer:
the answer is 7×9=(7×10)-(7×1)
25978.5964401. You can type it in a calculator and get the same answer!(:
Answer:
Length: 21 cm and Width: 6cm
Step-by-step explanation:
Let
be the width and
length of the rectangle. We know:
-------- eq. 1
(Perimeter of the rectangle) ------- eq. 2
Substitute equation 1 in equation 2:

Using the value of y, we find x.

Answer:
<h2>
The domain=3</h2>
Step-by-step explanation:
Answer:
Hence the 3.28 %or 2/61 of total work will be done .
Step-by-step explanation:
Given:
The pecan crops are harvested for friday and saturday (2days)
To find :
What fraction these 2 days corresponds to the harvesting days?
Solution;
The pecan crops are growing in America in state of Georgia
and consider that in months of October and November pecan crop becomes mature .
Hence the harvesting period is of 2 months considerably .
The month of October and November days are 31 and 30 .
Hence the Total days of harvesting are 61 days.
In these days total Pecan crops will be harvested.(100% work in 61 days)
Now the farmer harvest for 2 days only .
Required fraction=2/61
=0.0327869
=3.28%
Depending upon the crop field and planting answer will vary
But 3.28 % of total work will be done in 2 days on harvesting