Answer:
The hourly fee for rototiller is $3 per hour.
Step-by-step explanation:
We are given the following in the equation:
The rental company charged an initial fee of $43 with an additional fee per hour.
Let h represents the hourly fee.
The family paid $64 after renting the rototiller for 7 hours.
Thus, we can write the equation:

Solving the equation, we get,

Thus, the hourly fee is $3 per hour.
Equation:

where C(x) is the cost function and x is the number of hours rototiller is rented.
The hourly fee for rototiller is $3 per hour.
<span>(a) What is the capacity of the container?
Volume = length * width * height
V = 4ft * 2ft * 3ft
V = 24 ft</span>³
<span>
(b) How much material was used to make the container?
Surface area = sum of 6 faces of the prism
4 ft x 3 ft = 12 ft</span>² → 12 ft² x 2 = 24 ft²
<span>4 ft x 2 ft = 8 ft</span>² → 8 ft² x 2 = 16 ft²
<span>2 ft x 3 ft = 6 ft</span>² → 6 ft² x 2 = 12 ft²
<span>
Surface area = 24 ft</span>² + 16 ft² + 12 ft² = 52 ft²<span>
</span>
A=45
Explanation:
A= a+b/2*h
Answer:
1st one
Step-by-step explanation:
Since the x's for each one are going up by the same number, you are looking for a column of y's to either by going up by the same number or down by the same number.
The first table has a column of y's that look like this: 1/2 , 1 , 1 1/2, 2
This is actually going up for 1/2 each time.
This table shows a linear function.