Answer:
It will cost $39,337.92 for the piller.
Step-by-step explanation:
Given that,
The diameter of the cylinder, d = 8 m
Height of the cylinder, h = 9 m
If concrete cost $87 per cubic meter, we need to find how much the concrete cost for the pillar.
The volume of the cylinder is given by :

Cost per cubic meter = $87
Cost for 452.16 m³ will be :
C = 452.16 × 87
C = $39,337.92
Hence, it will cost $39,337.92 for the piller.
the slope is 6 or 12/6 i did the rise over run
point slope from
y2-y1
x2-x1
slope intercept form=
y=mx+b
Answer:
y= 0.5
Step-by-step explanation:
right on edg
Answer:
Sryy
Step-by-step explanation:
i just need points