Recall your d = rt, distance = rate * time.
if, the southbound train is going at a speed of say " r " mph, since we know that the northbound one is going faster by 4 miles, than is really going at " r + 4 " mph then.
now, we know in 2.5 hours, they're 330 miles from each other, thus the southbound train has been rolling for 2.5 hours, and the northbound train has also been rolling for 2.5 hours.
if the northbound train has covered on those 2.5 hours say " d " miles, then the southbound train has covered the slack, or " 330 - d ".

how fast is the northbound going? well, r + 4.
Answer:
5/a+b
Step-by-step explanation:
Answer:
Plot and connect (5,4), (3,0) and (7,0).
Step-by-step explanation:
This is in factored form and can be graphed directly from the equation. The equation shows the x-intercepts.
The x-intercepts are found by solving for x using the zero product rule.
(x-3)=0 so x = 3
(x-7) = 0 so x = 7
The intercepts are (3,0) and (7,0). Plot the points. The vertex will occur halfway between these points. 7-3 / 2 = 4/2 = 2. This means the axis of symmetry is at x = 5 and this is the x-coordinate of the vertex too.
Substitute x = 5 into the equation and solve for y.
-(5-3)(5-7) = -(2)(-2) = 4
The vertex is (5,4). Plot it and connect the points.
The line needs to be 8.06 m long
Explanation
Given that the ladder is 7 feet tall and the bottom of the slide should be 4 m away from the ladder.
The ladder,slide and the ground connecting them makes the sides of a right angled triangle with ladder as the height and ground as the base.
base=4m
height=7m
hypotenuse can be determined using pythagoras law
