Answer:b
Step-by-step explanation:
Answer:
Step-by-step explanation:
Both 25 and 125 are powers of 5. As such, they can be written as the powers they are:
25 = 5·5 = 5^2
125 = 25·5 = 5·5·5 = 5^3
25 x 4 equals 100. and 250 x 4 =1000. so one fourth of 1000 is 250.
Answer:
The WIP limit is 0.50 days.
Step-by-step explanation:
The Computation of WIP limits:
to begin with, it is required to compute the process and procedure efficiency which will be computed as follows:
Value Added Time = 12 days (arriving time)
Non-Value-Added Time = 12 days (departure time)
Efficiency = Value Added / (Value Added + Non-Value Added)
= 12 / (12+12)
= 12 / 24
= 0.50 or 50%
the most obligatory throughput time will be 0.25 days to realize the profits
WIP limit = Throughput time / Efficiency
= 0.25 / 50%
= 0.50 days.
The WIP limit is 0.50 days.
F(5) = 1/4(2)^5
f(5) = 1/4 (32)
f(5) = 8
answer
A. 8